Product Details
Place of Origin: CHINA
Brand Name: Zento
Certification: CE
Model Number: ZT-03C
Payment & Shipping Terms
Minimum Order Quantity: 2
Price: Negotiable
Packaging Details: wooden case
Delivery Time: 7-15 working days
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: 1000
Steel Thickness: |
6mm |
Rising Part Diameter: |
219MM |
Material: |
304 Stainless Steel Or Custom |
Product Type: |
Automatic Rising Bollard, Bollards Parking |
Diameter: |
219mm±2mm(OEM:168mm, 273mm) |
Rise Height: |
600mm(OEM:800mm,1000mm,1200mm) |
Steel Thickness: |
6mm |
Rising Part Diameter: |
219MM |
Material: |
304 Stainless Steel Or Custom |
Product Type: |
Automatic Rising Bollard, Bollards Parking |
Diameter: |
219mm±2mm(OEM:168mm, 273mm) |
Rise Height: |
600mm(OEM:800mm,1000mm,1200mm) |
Automatic rising bollard
Product details
Top flange 304 stainless steel, thickness 10mm using custom reflective film; Acrylic light plate to protect the light bar, more beautiful built-in ultra-high brightness LED waterproof light strip, light time can be set freely
Panel textured design, 304 stainless steel thickness of 10mm, the panel has a frosted and car light surface can be selected
Four outer hexagonal steel rods connect the guide pillar, and the pre-wire can be wound around it; easy to disassemble. Four adjustable limit top rubber to keep the vertical gap even after the column rises. The fixing screws are made of 304 stainless steel with nylon sleeve between the inner barrel and the flange for protection and durability
Suspension structure design, the use of gravity, the guide rail has a regulating role, when the vehicle passes, to prevent extrusion deformation four guide pillars, the force is uniform
Drainage method:
1. Use artificial drainage or electric pumping mode, need to dig a small pool near the column, regular manual and electric drainage.
2. Use the natural drainage mode to connect directly to the sewer.
Application:
Scientific and educational units: schools, computer rooms, research centers, libraries, etc.;
Leisure and entertainment venues: parks, scenic spots, pedestrian streets, municipal squares, playgrounds, etc..
Traffic: bus station, railway station, subway station, airport, etc..
Business service places: hospitals, banks, hotels, clubs, commercial buildings, etc..
Office space: large office buildings, public inspection units, hydro power and oil and gas units and other government agencies.
A. At the installation junction (two), dig out two square grooves
square grooves: (user-defined)mm (L)* 1000mm(W)* 1330mm(H)
B. Fill the bottom of the groove with 200mm-high concrete, the precision requirement of the horizontal plane is high(Lifting column rack can be subjected to force), and at the middle of the side of the trough, leave a PVC# for drainage